Elk Street Reconstruction Update: Phase 1 & Road Closure

Location: Elk Street – Talbot Street East to Victoria Street South


Map showing Phase 1 Closure of Elk Street from Talbot Street to Victoria Street SouthThe Phase 1 Closure will include Elk Street from Talbot Street to Victoria Street South


Road Closures and Access:

  • Closure of Elk Street, between Talbot Street East and Victoria Street South, will commence Monday, March 31, 2025.
  • Elk Street, between Talbot & Victoria Street, will be closed to through traffic, but local traffic will still be able to access the area.
  • Driveway access may be interrupted periodically during construction. Advanced notice will be given to all residences affected.
  • Commuters are asked to follow the marked detour routes.

Works Scheduled for March 31-April 4, 2025:

  • Installation of temporary traffic control signage and detour routes
  • Layout and commissioning of temporary watermain (Phase 1)
  • Pulverization of existing roadway asphalt
  • Sawcut and removal of private driveways and curb and gutter

Construction Safety:

  • Please respect the work zone.
  • Use caution when using the street or sidewalks near construction limits.
  • Maintain a safe distance from any moving equipment, stockpiles or trenches.

Further construction updates will be provided to residents as the project progresses.

The Town thanks residents for their patience and cooperation during this project.