Elk Street Reconstruction Update: Phase 1 & Road Closure
Location: Elk Street – Talbot Street East to Victoria Street South

Road Closures and Access:
- Closure of Elk Street, between Talbot Street East and Victoria Street South, will commence Monday, March 31, 2025.
- Elk Street, between Talbot & Victoria Street, will be closed to through traffic, but local traffic will still be able to access the area.
- Driveway access may be interrupted periodically during construction. Advanced notice will be given to all residences affected.
- Commuters are asked to follow the marked detour routes.
Works Scheduled for March 31-April 4, 2025:
- Installation of temporary traffic control signage and detour routes
- Layout and commissioning of temporary watermain (Phase 1)
- Pulverization of existing roadway asphalt
- Sawcut and removal of private driveways and curb and gutter
Construction Safety:
- Please respect the work zone.
- Use caution when using the street or sidewalks near construction limits.
- Maintain a safe distance from any moving equipment, stockpiles or trenches.
Further construction updates will be provided to residents as the project progresses.
The Town thanks residents for their patience and cooperation during this project.
Share Elk Street Reconstruction Update: Phase 1 & Road Closure on Facebook
Share Elk Street Reconstruction Update: Phase 1 & Road Closure on Twitter
Share Elk Street Reconstruction Update: Phase 1 & Road Closure on Linkedin
Email Elk Street Reconstruction Update: Phase 1 & Road Closure link

Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends