You need to be signed in to add your comment.

Elk Street Reconstruction Update: August 27, 2025

Elk Street Reconstruction Update: August 27, 2025

Work Complete to Date:

Phase 1

  • Multi-Use pathway, sidewalk, curb and gutters have been installed.
  • Residential driveways from property line to road have commenced and nearing completion.
  • Landscape restoration is underway. Sod is being watered regularly, additional watering is always encouraged by residents.

Phase 2

  • Temporary water line installation is complete and operational.
  • Installation of the Sanitary line is now complete.
  • Installation of the new waterline is now underway.

Work Scheduled for the Next Weeks:

Phase 1

  • Restoration of landscape areas.

Phase 2

  • Continuing with installation of the new waterline and commissioning.
  • Being installation of the new storm line.
  • Prep road base for curb and asphalt.

Road Closures and Access:

  • Elk Street will be closed to through traffic during construction, but open to local traffic.
  • Driveway access may be interrupted periodically during construction. Notification will be provided in advance of any prolonged driveway access disruptions.

Phase 1

  • Local residence East of work area, access from Talbot Street
  • Local residence West of work area, access from Victoria Street

Phase 2

  • Local residence East of work area, access from Victoria Street
  • Local residence West of work area, access from John St. S.

Construction Safety:

  • Your safety is very important to us. Please respect the work zone.
  • Please use caution when using the street or sidewalks near the construction limits.
  • Maintain a safe distance from any moving equipment, stockpiles or trenches.
Share Elk Street Reconstruction Update: August 27, 2025 on Facebook Share Elk Street Reconstruction Update: August 27, 2025 on Twitter Share Elk Street Reconstruction Update: August 27, 2025 on Linkedin Email Elk Street Reconstruction Update: August 27, 2025 link