Elk Street Reconstruction Update: August 27, 2025
Elk Street Reconstruction Update: August 27, 2025
Work Complete to Date:
Phase 1
- Multi-Use pathway, sidewalk, curb and gutters have been installed.
- Residential driveways from property line to road have commenced and nearing completion.
- Landscape restoration is underway. Sod is being watered regularly, additional watering is always encouraged by residents.
Phase 2
- Temporary water line installation is complete and operational.
- Installation of the Sanitary line is now complete.
- Installation of the new waterline is now underway.
Work Scheduled for the Next Weeks:
Phase 1
- Restoration of landscape areas.
Phase 2
- Continuing with installation of the new waterline and commissioning.
- Being installation of the new storm line.
- Prep road base for curb and asphalt.
Road Closures and Access:
- Elk Street will be closed to through traffic during construction, but open to local traffic.
- Driveway access may be interrupted periodically during construction. Notification will be provided in advance of any prolonged driveway access disruptions.
Phase 1
- Local residence East of work area, access from Talbot Street
- Local residence West of work area, access from Victoria Street
Phase 2
- Local residence East of work area, access from Victoria Street
- Local residence West of work area, access from John St. S.
Construction Safety:
- Your safety is very important to us. Please respect the work zone.
- Please use caution when using the street or sidewalks near the construction limits.
- Maintain a safe distance from any moving equipment, stockpiles or trenches.
Share Elk Street Reconstruction Update: August 27, 2025 on Facebook
Share Elk Street Reconstruction Update: August 27, 2025 on Twitter
Share Elk Street Reconstruction Update: August 27, 2025 on Linkedin
Email Elk Street Reconstruction Update: August 27, 2025 link

Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends